







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Sterling Home Additions & ADU: The Los Angeles Owner’s Guide
We build and finish Sterling-compatible home additions and ADUs across Los Angeles, and installed projects typically run $53,100 to $153,400 for a home addition and $106,200 to $259,600 for a full ADU. Nothing here is a same-day job: additions and ADUs are planned construction, sequenced over weeks and months, and we quote them that way with a written price before anyone touches a tool. An owner usually lands on this page after a walkthrough, an inspection, or a report from a framer and realizes the scope they were shown doesn’t match what the structure actually needs. This guide is written for that moment: you have a Sterling drawing set, a half-finished build, or a failed connection, and you need the scope, the range, and the terms in plain English.
Which Sterling Models This Applies To

Sterling’s line covers several families of structures, from attached single-story additions to detached ADU shells and garage conversions, and the part that matters most to your scope is the one that’s failing or missing: the foundation and anchorage, the structural framing and shear detailing, the rough-in trades, or the finish-out. Identify the correct part by matching the plan set number to the model it was drawn for, then verifying the label on the structure itself. Existing structures carry a data plate or stamp at the foundation or on the frame, and the plan set will show the same identifier. If the labels don’t match, you’re not pricing the same part.
For the OEM-versus-aftermarket decision, the honest answer is that the label matters less than the spec. Sterling’s original components are engineered to a defined load and finish standard, and a quality equivalent that meets or exceeds that standard is legitimate for most finish and rough-in items. Structural and anchorage items are where we hold the line: those need a documented spec, not a lookalike. We work with KraftMaid, Cambria, and Silestone on finish-out for these projects and others in the approved brand set, and we specify to the plan. We’re an independent service provider, not affiliated with Sterling, and we don’t stock parts or carry them on a truck. We source to your model, your plan set, and your approval.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Sterling Home Additions & ADU Is Failing
- Doors that won’t close and cracks at wall corners. Settlement at the foundation or a missing anchor detail is letting the structure move. Hairline cracks are normal; cracks that widen over a month are telling you something below is wrong.
- Damp at the floor plate and along the slab edge. Poor drainage or a failed vapor detail lets water wick up the framing. This is a Los Angeles pattern: rain loads here are concentrated into a few storms, and a slow leak that failed during a single downpour often took a season to show.
- Bouncy or deflecting floors. Undersized joists or a missed blocking detail is showing up in how the floor moves. It’s a structural sign, not a cosmetic one.
- Gaps at the roof tie-in and at the wall connection. A failed flashing or a skipped structural tie at the joint is letting air and water in where the addition meets the house.
- Rough-in trades that don’t match the drawing. A missing cleanout, an undersized circuit, or a vent that doesn’t clear the roof means the scope was short. It’s caught at inspection or, worse, at move-in.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

Installed pricing for an addition in Los Angeles runs $53,100 to $153,400, and an ADU runs $106,200 to $259,600. A garage conversion, which is the tighter path to an ADU, runs $35,400 to $94,400. The range on an addition tracks the footprint, whether it’s attached or detached, and how much foundation and tie-in work is needed. On an ADU it tracks unit size, kitchen and bath finish level, and the utility upgrades. Finish-out pricing sits alongside the build: kitchen remodels at $16,520 to $53,100 and bathroom remodels at $10,620 to $33,040 for the spaces inside.
Every price we give is written before work starts, with the scope line-itemed and no numbers that move at the door. All completed work carries the 365-Day Done Right Promise: if the work fails inside that year, we come back and correct it at no charge. The scope in writing is what you’re buying. The guarantee is what backs it.
DIY or Call Us?
There’s a safe split here. You can check the label against your plan set, photograph the crack or gap, note where the floor is soft, and confirm whether the rough-in matches the drawing. That’s useful information and it costs nothing. What’s not safe is trying to correct structural anchorage, tie details, or roof flashings yourself on a Sterling addition. Those components carry load and manage water, and an error there shows up as a building that moves or rots, not a fix that fails quickly.
We pull permits and we pass inspections, and the paperwork is part of the job, not a separate surprise. Our technicians are background-checked, uniformed, and bring up to 22 years of experience to the work. Calls are answered by a live person, around the clock. If your structure is showing any of the signs above, call (844) 343-6681 and we’ll walk it through with you.
FAQs

How long should a Sterling addition or ADU hold up in Los Angeles? A properly built addition should hold for the life of the house with maintenance on the water-management details. The realistic checks are the roof tie-in and the drainage at the foundation every few years, and a look at the framing after any major storm. If you’re seeing movement in a structure under ten years old, that’s a scope problem worth pricing.
Can it be repaired instead of replaced? Often yes, and the scope tells you which. A failed flashing or a single missing tie is a repair; a foundation that’s settled or framing that’s undersized is a rebuild of that section. We price both so you can see the difference before you decide.
How long does the work take? An addition typically runs several weeks to a few months depending on size and tie-in; an ADU runs longer because of the utility and permit work. We give that timeline in writing with the price, and we don’t promise a same-day or next-week finish on planned construction.
How do you source the part? We source to your Sterling model and plan set, matching the spec at the foundation, frame, and finish level. We don’t carry parts on a truck and we don’t stock a local inventory. We document the spec, order to it, and confirm it against the plan before install.
Call (844) 343-6681 to schedule your free estimate on your Sterling addition or ADU in Los Angeles. We’ll send a written price, a clear scope, and the guarantee terms in writing before a single tool comes out. Estimates are free, and a live person answers the phone.
Written by the team at Bradford Remodeling Co Los Angeles, serving Los Angeles and nearby areas.












