







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
IKO Home Additions & ADU: The Los Angeles Owner’s Guide
An IKO-spec home addition or ADU in Los Angeles typically runs $53,100 to $153,400 for a full addition and $106,200 to $259,600 for a detached or attached ADU, with the exact number written down before any work starts. The tag on the “IKO” side is usually the accessory structure: IKO supplies roofing systems, waterproofing membranes, and weather-barrier products specified into a lot of the additions and accessory dwelling units we build, and when that envelope product fails, you find out through a ceiling stain, a soft spot, or a membrane lifting at a parapet. We install IKO-compatible additions and ADUs across Los Angeles, and Bradford Remodeling Co Los Angeles is an independent service provider, not affiliated with IKO.
Which IKO Models This Applies To

IKO doesn’t make the addition – it makes the roof and weatherproofing layers that go onto it. The lines that show up on Los Angeles ADU and addition specs are the IKO Cambridge and Dynasty shingle lines, the Armourglass and Stormtite underlayments, and the AquaBarrier self-adhered membranes used around roof penetrations, dormers, and low-slope tie-ins. If your plans or your contractor’s submittal call out a specific IKO product, that reference lives in the project documents – not on a part you can read off a shelf.
Identify what’s actually up there before anyone quotes a fix. Look at the pitch: Dynasty and Cambridge are steep-slope products, so a flat or low-slope ADU roof over a garage conversion is a different system entirely, usually a membrane. For steep-slope, a shingle wrapper or bundle band gives you the line and the color. Measure the exposure – the visible height of each shingle course – because a repair has to match the existing exposure or the patch reads as a lump from the street.
OEM vs. equivalent for IKO
Matching the exact IKO line matters more than most homeowners expect. Color names repeat across IKO’s own lines but the shingle profile and the warranty terms differ. When the original line is discontinued, a like-for-like replacement from a documented brand (GAF and CertainTeed are on our approved roster alongside IKO) is often the practical answer for a small repair, provided the underlayment and flashing details are brought up to current spec. What we won’t do is promise a “perfect match” to a weathered 12-year-old roof – sun fade in Southern California makes that a fiction.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your IKO Home Additions & ADU Is Failing
- Brown rings on the ADU ceiling after a rain. Water is getting past the IKO underlayment or a membrane lap, and the drywall is soaking it up before you see a drip.
- Shingles curling or lifting at the ridge and valleys. Heat cycling plus a failed seal strip. In Los Angeles, a west-facing addition roof can bake to 150°F on a July afternoon, and the sealant strip gives up years before the shingle itself does.
- A soft, spongy spot when you press on the soffit or fascia. The substrate – the wood sheathing under the roofing – has been wet long enough to rot. This is a structural signal, not a cosmetic one.
- Blistering or lifting at the parapet and around the ADU’s plumbing vents. Those penetrations are where IKO membranes and flashing get asked to do the most work, and where we see the first failures on Los Angeles additions.
- Granules collecting in the gutter or at the downspout base. The shingle surface is shedding its protective layer. Some granule loss is normal in year one; steady loss after year 12 is a countdown.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

For Los Angeles, expect a full home addition at $53,100 to $153,400, an ADU build at $106,200 to $259,600, and a garage conversion at $35,400 to $94,400. Where the failure is confined to the IKO envelope layer – a roof repair rather than a rebuild – roof repair runs $470 to $2,125, roof replacement $9,440 to $23,600, and metal roof installation $17,700 to $47,200.
What drives the range: square footage of conditioned space, whether the ADU is detached or attached, the roof pitch and complexity (a simple gable costs less than a hip with four valleys), foundation and utility work, and Los Angeles permitting fees and plan-check timelines. Parts and labor are broken out line by line. Every finished project carries the 365-Day Done Right Promise – a full-year written guarantee; if the work fails inside that window, we come back and correct it at no charge.
DIY or Call Us?
You can safely check a lot of this yourself: look for ceiling stains, press gently on soffit and fascia, clear leaves off the ADU roof, and photograph the shingle edges so you know what you’re describing on the phone. What you shouldn’t do is climb onto a pitched ADU roof, pry up shingles to “take a look,” or try to reseal a parapet or vent penetration yourself. Fall risk on a two-story addition is the real hazard here, and a bad seal job around a plumbing vent does more damage than the leak you started with – it traps water in the substrate where you can’t see it. Roofing and envelope work belongs to a trained, insured crew. Call (844) 343-6681 and we’ll tell you straight whether you’re looking at a repair or a rebuild.
FAQs

An IKO steep-slope shingle system on a Los Angeles ADU typically holds 15 to 20 years in practice, shorter on a west-facing roof with full afternoon sun and longer under tree shade. The shingles often outlast the flashing and underlayment, which is why an inspection at year 10 catches failures before the substrate gets wet. Call (844) 343-6681 for a free estimate on a replacement.
Often yes, if the failure is localized to a penetration, a valley, or one roof plane and the substrate underneath is still sound. A repair is the right call when the shingle field is healthy and the leak traces to flashing or a membrane lap. When granules are gone across the whole field or the sheathing is rotten, a repair just buys you a season. Call (844) 343-6681 and we’ll assess it honestly.
A localized IKO envelope repair is usually a short job measured in days, while a full roof replacement on an addition typically takes a few days to a week depending on size and access. A full addition or ADU is a months-long build with Los Angeles plan check and inspections built into the schedule. Call (844) 343-6681 for a written timeline with your estimate.
We source IKO and equivalent envelope products through documented suppliers, matched to the product called out in your plans or measured off the existing roof, so the line and color are traceable. We work from a documented roster of premium brands – IKO, GAF, CertainTeed, and Owens Corning for roofing and weatherproofing, and KraftMaid, Cambria, and Silestone on the interior finishes of the addition. We don’t claim to stock parts or carry them on a truck; every material is ordered to the job. Call (844) 343-6681 and we’ll put the spec in writing before work starts.
Written price before any work starts. Live person on the phone 24/7. 365-Day Done Right Promise on every project. Call (844) 343-6681 to schedule your free estimate for your IKO-compatible home addition or ADU in Los Angeles.
Written by the team at Bradford Remodeling Co Los Angeles, serving Los Angeles and nearby areas.












