







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Quikrete Home Additions & ADU: The Los Angeles Owner’s Guide
If you’re pricing a Quikrete-based addition or accessory dwelling unit in Los Angeles, plan on $53,100 to $153,400 for a home addition and $106,200 to $259,600 for a full ADU. That spread covers design, permits, foundation, framing, and finish; the number that lands belongs to your lot, not a brochure. Owners usually find trouble the same way: a hairline crack that keeps reopening in the stem wall, a cold joint that crumbles when probed, or a patch of Quikrete slab that stays damp weeks after the rest cured. Each points to a mix or pour problem, not a cosmetic one.
Key Takeaways
- Installed addition or ADU pricing in Los Angeles runs $53,100 to $153,400 for an addition and $106,200 to $259,600 for a full ADU.
- Quikrete bagged mixes are sold by compressive strength (psi), and the wrong psi for a footing or stem wall is the most common failure we see.
- We don’t stock Quikrete products on a truck; we source to your project’s mix specification and the bag grade the structural plan calls for.
- Bradford Remodeling Co Los Angeles is an independent remodeling contractor, not affiliated with Quikrete.
Which Quikrete Models This Applies To

Quikrete isn’t a single product; it’s a family of bagged mixes, each rated for a different job. For additions and ADUs, the ones that show up are concrete mix (often the 80-lb bags rated for structural pours), high-strength concrete mix, fast-setting mix, and anchoring or repair compounds. The number that matters is compressive strength: a mix sold as 4,000 psi is built for footings and slabs, while a fast-setting repair mix at a lower rating has no place under a load-bearing stem wall. We match the mix grade to what your structural plan specifies – never the other way around.
Identifying the right product starts with the label and the batch. Quikrete bagged mixes carry the strength rating and mix type on the bag, and the lot code matters: mixes that sat through a wet season or a hot warehouse can lose workability before they hit the site. If your existing work is failing, the fault is usually the mix grade or the pour, not the brand. As an independent contractor we buy to specification, and we don’t keep a stock of Quikrete bags; the material arrives for your job only.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Quikrete Home Additions & ADU Is Failing
Concrete tells you it’s in trouble long before it fails. Here’s what we look for on a Los Angeles addition or ADU slab.
- Hairline cracks that keep widening. Shrinkage cracks are normal; cracks that grow along a stem wall or footing point to a thin mix or a pour that cured unevenly. If they reach a finger width, get a structural look.
- Crumbling at cold joints. Where two pours met, the surface often spalls. A mix at the wrong psi or a poorly keyed joint left a weak seam that takes the load badly.
- Damp or dark patches that won’t dry. A slab that stays wet after the rest of the pour has dried can signal a mix that’s too porous for the site – a real problem on Los Angeles lots where soil drains slowly.
- Chalky, dusting surface. A soft, powdery top coat usually means too much water at the mix or a curing window that got skipped. It wears away under foot traffic and blocks finish adhesion.
- Efflorescence coming through. White salt blooms on the surface trace moisture moving through the concrete. On an ADU or addition wall, that’s a cue to check grading, drainage, and the mix under the finish.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

For Los Angeles, an addition runs $53,100 to $153,400 and a full ADU runs $106,200 to $259,600 installed. A garage conversion sits at $35,400 to $94,400. What drives the number: lot access, soil, foundation type, whether utilities run far, and the finish level. Every price we give is written before work starts, itemized by scope – no figure that moves when the crew shows up.
| Project | Installed Range (Los Angeles) |
|---|---|
| Home Addition | $53,100 – $153,400 |
| ADU Construction | $106,200 – $259,600 |
| Garage Conversion | $35,400 – $94,400 |
Parts and labor show up separately on that written price, so you see what the Quikrete mix grade costs versus the framing and finish around it. Permits are pulled by us and inspections passed before we call the job squared away. Every completed project carries the 365-Day Done Right Promise: if the work fails within that year, we come back and correct it at no charge.
DIY or Call Us?
You can safely check for the warning signs above – look at the joints, probe a crumbling spot with a screwdriver, watch a damp patch. What you should not do is mix and pour structural concrete under an addition or ADU yourself. A footing or stem wall poured at the wrong psi, or cured wrong, can fail in ways that aren’t visible until it costs a re-pour and structural fixes. The load path no longer goes where the plan sent it. That’s a job for a trained crew with a structural plan and a licensed inspector. If you see the signs, call (844) 343-6681 for a free estimate – a real person answers, any hour.
FAQs

Properly mixed and cured, a Quikrete structural pour under an addition or ADU can hold for decades in Los Angeles. Real lifespan comes down to mix grade, water content at the pour, and curing, not the brand.
Sometimes a cosmetic repair or surface patch is enough if the failure is shallow – dusting, minor spalling, or a hairline crack that hasn’t moved. If the crack widens along a footing or stem wall, that points to the structural pour and needs a real evaluation before anyone patches it.
An addition or ADU is a months-long project, not a same-day swap: design, permitting, foundation, framing, and finish each take time, and the schedule gets written into your scope before work starts. Faster projects like a garage conversion still run weeks, not days.
We buy to the mix grade your structural plan calls for, not from a stock we keep on hand. Because we don’t carry Quikrete on a truck, the right bag and batch arrive for your job, with the strength rating documented for the inspection.
Call (844) 343-6681 to schedule your free estimate and give us a look at the pour.
Written by the team at Bradford Remodeling Co Los Angeles, serving Los Angeles and nearby areas.












