







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Mr-Glass Driveway & Pavers: The Los Angeles Owner’s Guide
We install and repair Mr-Glass-compatible driveway and paver systems across Los Angeles, and a full paver driveway replacement typically runs $8,260 – $21,240 installed, while concrete driveway replacement lands at $5,310 – $14,160. Most Los Angeles owners don’t go looking for this page until the failure is obvious: a paver that rocks when you step on it, a settled dip that holds water after a rain, or a hairline crack in a Mr-Glass slab that spreads by an inch a season. That movement is usually the base, not the surface.
Bradford Remodeling Co Los Angeles is an independent service provider and is not affiliated with Mr-Glass. We work on Mr-Glass installations the same way we work on every driveway in Los Angeles: written price first, documented scope, and the 365-Day Done Right Promise behind the finished job.
Key Takeaways
- Mr-Glass pavers and slabs rarely fail on the surface first. The base (subgrade and bedding sand) is what gives way.
- Full paver driveway replacement in Los Angeles: $8,260 – $21,240. Concrete replacement: $5,310 – $14,160.
- Driveway sealing runs $295 – $825 and extends paver life but won’t fix movement underneath.
- Small settlement, chipped edges, and joint sand loss can often be repaired instead of replaced.
Which Mr-Glass Models This Applies To

Mr-Glass sells a broad line of pavers, slabs, and stepped stone systems, and the fit question isn’t a model number the way it would be for a garage door opener. It’s dimensional. Each Mr-Glass paver series has its own nominal thickness, face dimensions, and joint width, and those have to match the existing run if you’re patching rather than replacing the whole driveway. A 60mm paver won’t sit flush against a 50mm bed once the base is disturbed, and the seam shows within one season of LA sun and foot traffic.
To identify what you have, measure a single intact paver at three points and note the joint width with a tape, not a ruler balanced by eye. Check the underside of a loose unit for a mold stamp or series code, and photograph the full pattern from above so a supplier can match the color and texture family. When a series is discontinued, our approach is a quality aftermarket equivalent sized to the existing bed, not a forced patch that leaves a visible step.
One compatibility gotcha we see in Los Angeles: the same face dimension can vary in thickness by 4 – 6mm between production runs. Mixing runs on one driveway is what produces the rocking edge, not the paver quality.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Mr-Glass Driveway & Pavers Is Failing
- Rocking or loose pavers. The bedding sand under that unit has washed out or compressed. Rain runoff and irrigation overspray accelerate it, and every step widens the gap underneath.
- Dips and pooling water. The subgrade has settled or wasn’t compacted correctly at install. Standing water after an LA rain is the fastest tell, and it points to base failure, not surface wear.
- Cracked slabs or paver edges. Heavy loads or an uneven base, often near a garage apron or where a downspout dumps onto the drive. A crack wider than 1/8 inch usually means the base moved.
- Lost joint sand and weeds. Polymeric or joint sand has eroded, letting water in and silt through. This is fixable early and expensive if ignored.
- Sun-faded color or chipped face. UV exposure and age. Cosmetic on its own, but faded units that also move point to a bedding problem worth checking.
Replacement Cost & What’s Included

In Los Angeles, a full paver driveway replacement runs $8,260 – $21,240 and concrete replacement runs $5,310 – $14,160. Driveway replacement across both materials lands at $5,900 – $16,520, and asphalt paving runs $4,130 – $10,620. What drives the number up or down: driveway square footage, whether the old base has to be excavated and re-compacted, drainage correction, and material grade. The high end is a driveway with subgrade rebuild and a drainage fix. The low end is a straightforward re-lay over a sound base.
Every price we give is written before work starts, itemized, and fixed. No numbers that move at the door. Every completed driveway carries the 365-Day Done Right Promise: if the work fails within that year, we return and correct it at no charge. We also work with documented hardscaping brands including Belgard and Unilock, alongside KraftMaid, Cambria, and Silestone in our interior work.
See the difference
Before
After
Before
After
Before
AfterDIY or Call Us?
What you can safely check: photograph the failure, measure a paver, note where water pools, and confirm the joint sand condition. What goes wrong for a homeowner tackling a paver re-lay: pulling one unit loosens the neighbors, the bedding under a driveway needs a compacted base that hand tools can’t reach, and a driveway that’s almost flat will pond in a way you can’t correct once the pavers are set. And the paving runs carry real weight – a driveway sits under vehicle loads, so a base that’s close is not enough.
If the movement is confined to one or two pavers and the base below is solid, that’s a repair and you can often watch it happen. If the whole run rocks or the surface is dipping, it’s a base job. Call (844) 343-6681 and we’ll tell you which one you have before anyone swings a hammer.
FAQs

How long do Mr-Glass pavers last in Los Angeles? Fifteen to twenty-five years is a realistic range for a well-based paver driveway in LA, and the pavers themselves usually outlast the base. Los Angeles sun is hard on color, not on the stone, so the failure you see is nearly always settlement, not material wear. Call (844) 343-6681 for an exact quote – estimates are free.
Can my Mr-Glass driveway be repaired instead of replaced? Often, yes. Single-paver rocking, lost joint sand, and chipped edges can be repaired by re-setting the affected units over new bedding and re-sanding the joints. If the whole run has settled or water pools across the surface, replacement is the honest answer. Call (844) 343-6681 and we’ll look at the photos and tell you which it is – estimates are free.
How long does a Mr-Glass driveway replacement take? A typical Los Angeles paver driveway takes about three to five working days from tear-out to final sand, weather permitting. Concrete replacement runs two to four days plus cure time. A small repair can be done in a few hours. We schedule against the actual scope, not a best case. Call (844) 343-6681 to book your free estimate.
How do you source Mr-Glass pavers and parts? We source through documented hardscaping suppliers and match the existing series, color, and dimensions from your measurements and photos. When a Mr-Glass series is discontinued, we source a quality equivalent sized to your existing bed and show you samples before anything gets ordered. Every material we install is documented, so specifications are traceable. Call (844) 343-6681 for a written, itemized estimate.
Get a Written Price on Your Mr-Glass Driveway in Los Angeles
Before we quote a driveway in Los Angeles, we look at the base, the drainage, and the paver condition so the price matches what actually needs doing. You’ll get a live person on the phone, a written line-item price before any work starts, and the 365-Day Done Right Promise on the finished job. Our technicians have up to 22 years of experience, and every technician on the job is background-checked and uniformed, so you know who’s on your property before they arrive.
Call (844) 343-6681 for a free estimate on your Mr-Glass driveway or paver repair. Bradford Remodeling Co Los Angeles handles the job squared away: clean site, documented scope, and the signed guarantee in your hand at close.
Written by the team at Bradford Remodeling Co Los Angeles, serving Los Angeles and nearby areas.












