







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Dvele Home Additions & ADU: The Los Angeles Owner’s Guide
We build and finish additions and accessory dwelling units to Dvele’s factory specs, and installed pricing in Los Angeles runs from $53,100 to $153,400 for an addition and $106,200 to $259,600 for a full ADU. Owners usually find the failure the slow way: a seam at the module joint that has started to telegraph through the drywall, a flashing detail above a Dvele roof cassette that drips after a Santa Ana wind event, or a factory door opening that no longer closes square because the foundation pad under that module settled. The module itself is sound. It’s the site-built connections and finishes around it that fail first.
Which Dvele Models This Applies To

Dvele builds in panelized and modular systems, and the details that matter for an addition or ADU are the module-to-foundation connection, the roof-to-wall flashing where a Dvele cassette meets your site-built structure, and the interior finishes that tie the two together. Identifying the right scope starts with the Dvele build packet that came with the unit: it lists the panel series, the roof assembly, and the window and door schedules. If you don’t have that packet, measure the module footprint and the wall heights, and photograph the flashing and connection hardware. Those measurements plus the unit’s serial plate are what any contractor needs to match scope correctly.
On OEM versus aftermarket: for structural hardware and proprietary flashing profiles, OEM from Dvele is the right call. There is no safe generic substitute for a designed drainage plane. For finishes and fixtures inside the unit, quality aftermarket equivalents are fine and often better specified, and we document exactly which brand and model went in so the record stays traceable. We work with KraftMaid, Cambria, and Silestone among others, and every specification we install carries its manufacturer paperwork. Dvele is not affiliated with us; we’re an independent Los Angeles contractor that knows the build system.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Dvele Home Additions & ADU Is Failing
- Drywall cracks along the module seam. The module-to-module joint is moving differently than the panels beside it. Usually a connection or shim issue, not a framing failure.
- Water staining on the ceiling near a roof transition. Flashing at the Dvele cassette edge has lifted or the sealant has aged out. In Los Angeles UV and dry heat, sealant on a south- or west-facing transition dries out faster than most owners expect, often inside eight to ten years.
- A door or window that sticks after the first hot week of the year. The module has settled on its pad or the foundation anchor is loose. Look for a gap at the sill before you blame the door.
- Floors that feel soft or squeak in one zone. Subfloor panel movement at the connection point between a Dvele module and the site-built floor. Handle it before the finish floor wears through.
- Condensation or cool air at an interior wall. The insulation or air seal at the module joint has opened up, letting the outside in. That raises your energy bill before it shows as a visible problem.
Replacement Cost & What’s Included

For Los Angeles, an addition runs $53,100 to $153,400 installed, and a full ADU runs $106,200 to $259,600. A garage conversion sits between them at $35,400 to $94,400. What drives the range: square footage, whether the connection point is a simple gable or an awkward transition, how much interior finish has to be rebuilt to make the fix invisible, and permitting. We give you a written price before any work starts, line by line, with the part cost and labor broken out so you see exactly what you’re paying for. No number moves at the door.
Every completed project carries the 365-Day Done Right Promise: a full year of written coverage, and if the work fails inside that window, we come back and correct it at no charge. Dvele units in Los Angeles face a specific combination of UV exposure, dry heat, and the occasional hard rain event, and we take that into account when we spec materials and sealants. Any premium product we install, whether Dvele hardware or the finishes we install inside, carries its manufacturer documentation alongside our own written guarantee.
See the difference
Before
After
Before
After
Before
AfterDIY or Call Us?
You can safely check the visible signs yourself: look at the flashing lines from the ground with binoculars, measure and photograph the cracks along the seams, note which door sticks and in what weather, and find the serial plate. Write down what you find. That’s the information a contractor needs.
Do not get on the roof of an addition or ADU to inspect or re-seal a flashing detail. That work is at height, on an unfamiliar surface, over a structure you don’t know the full load path of, and a fall off a one-story roof can end a career and worse. Any work that touches the structural connection, the electrical rough-in, or the roof envelope is not homeowner work either. That’s not a scare tactic; it’s the reason those trades are licensed.
Call us at (844) 343-6681 for a free estimate. A live person answers, every time, and we’ll give you a written line-item scope after we’ve seen the unit.
FAQs

The Dvele shell should hold for decades. The site-built connections around it need attention sooner. In Los Angeles, expect the roof flashing and exterior sealant to be the first things to fail, often inside ten years depending on sun exposure and which side of the unit faces west. The interior finishes you choose will set their own timeline; quality cabinetry and surfaces will hold longer than builder-grade, and we note the brand and model of everything we install so you can look up its manufacturer warranty later.
Often yes. A lifted flashing detail, a cracked seam, or a soft subfloor at one connection point is usually a repair, not a rebuild. We diagnose what’s actually failing, tell you whether the repair will hold long-term, and give you a price for both options in writing so you decide with the numbers in front of you. Call (844) 343-6681 and we’ll set a visit.
Most seam and flashing repairs are done in a day or two once we’ve scoped them. A larger rebuild of finishes around a module connection will take longer, and we tell you the schedule in the written estimate before anything starts. No surprise timelines mid-job.
OEM hardware and proprietary flashing come from Dvele. We order what’s called for in the build packet, and if the part is no longer available, we tell you that up front and show you the approved equivalent with its spec sheet attached. For finishes and fixtures, we work from a documented roster of premium brands including KraftMaid, Cambria, and Silestone, so every part in your unit has a paper trail. That’s how The Garrison Standard works: every price and every guarantee is in writing before a tool comes out.
Contact
If your Dvele addition or ADU in Los Angeles has a seam, flashing, or finish that isn’t holding, call us at (844) 343-6681 for a free estimate. We’ll inspect the unit, explain what failed and why, and hand you a written price before any work begins. Bradford Remodeling Co Los Angeles technicians bring up to 22 years of experience to the job. Our crews are background-checked and uniformed, the price is written before we start, and every project carries the 365-Day Done Right Promise. When we close out, you get a clean site, a documented scope, and your signed guarantee in hand.
Written by the team at Bradford Remodeling Co Los Angeles, serving Los Angeles and nearby areas.












